Harmony, Target 1 Shaft, Free State, South Africa
Target 1 Shaft Cement Truck Offloading and Underground Pneumatic Conveying System..
The system includes cement tanker pneumatic offloading to an existing silo, and then discharge from the silo into a pressure vessel and pneumatic conveying to convey the cement underground. The capacity is approximately 0.5 to 1 t/h, and the conveying distance approx. 4km with a 2km vertical drop down the mine shaft.
Turnkey Contractor including: project management, design and design management, manufacturing, installation and commissioning of the mechanical, structural, electrical, control, instrumentation and civil engineering works for the described scope

