The project incorporated the design, engineering, procurement, fabrication, delivery, installation, commissioning and testing of the new ash transfer system. The scope included:
- Design of a new fly ash transfer system with a capacity of 55 tonnes per hour, suitable for handling fly ash or lime during start-up conditions and material temperatures of up to 200°C
- Review of the existing scraper conveyor and bucket elevator system to confirm its ability to meet the required capacity, including modifications where required
- Design and integration of the new ash transfer system into the existing PF Boiler ash handling infrastructure
- Tie-in of the new system to the existing ash silo
- Integration with the existing precipitator feed conveyors, including the required isolation valves and rotary feeders
- Structural and mechanical design, including detailing of equipment supports and specification of foundation/plinth loads
- Specification of the associated electrical and control requirements
- Procurement and fabrication of the new mechanical, structural and associated electrical equipment
- Delivery of the complete system and equipment to site
- Mechanical and structural installation of the new ash transfer system
- Constructability reviews, construction planning and rigging studies
- Provision of rigging equipment and resources required for installation
- Corrosion protection of new and modified steelwork in accordance with Sappi specifications
- Final commissioning and performance testing of the completed system