Projects
From power stations to platinum mines, RULA has designed, installed, and commissioned bulk materials handling systems across Southern Africa’s most demanding industrial sites.
Track Record.
From ash and dust handling at power stations to underground mixing stations and filter installations across mining and cement operations, RULA delivers turnkey bulk materials handling projects end-to-end — design, fabrication, installation, and commissioning.

Thorncliffe To Lion Smelter Ropeway
A 32km continuous ropeway system designed for 192 TPH throughput, connecting the Thorncliffe Mine directly to the Lion Smelter facility.
View →
Kusile Powerstation: Ash & Gypsum Handling
Overland conveyor and stacker infrastructure handling ash and gypsum at 1,600 TPH system capacity.
View →
Kusile Powerstation: Submerged Scraper Conveyor
Installation, commissioning, and operational handover of an SSC system for cooling, storage, and controlled discharge of boiler bottom ash.
View →
Camden Power Station: Ash Handling Plant Upgrade
Upgrade and construction of new Ash Handling Plant systems to manage increased ash volumes as the existing Ash Dam nears end of life.
View →Medupi Power Station: Flue Gas Duct Ash Handling
Removal and hydraulic conveying of fly ash from flue gas duct hoppers into the SSC, with continuous removal during boiler operation.
View →
Van Eck Power Station: Coarse Ash Conveying System
A fully automated Submerged Belt Ash Conveying Plant replacing tractor-based coarse ash removal across all four units.
View →
PPC Hercules: Cement Handling & Bulk Dispatch
Ongoing operation and maintenance of the cement handling and bulk dispatch silo mechanical systems.
View →
Tau Tona Mine: Underground Cement Mixing Station
Design, manufacture, supply, delivery, installation, and commissioning of a modular underground cement mixing station for AngloGold Ashanti.
View →
PPC Dwaalboom: Final Mill Fly Ash Feed
Civil construction and remedial concrete works for the silo supporting infrastructure of the Final Mill Fly Ash Feed installation.
View →
Hendrina Power Station: Mobile Scraper Chain Feeder
Supply, installation and commissioning of two heavy-duty mobile scraper chain feeders reclaiming coal onto the station's existing conveyor.
View →Sappi Ngodwana Mill: Fly Ash Handling System Upgrade
Replacement of the fly ash incline conveyor with a newly designed transfer system integrating existing and new precipitator ash conveyors.
View →
Grindrod TCM: Back of Terminal Expansion
Design, engineering, manufacture, supply, construction, installation and commissioning of the new Back of Terminal bulk materials handling facility.
View →
Sappi Ngodwana Mill: Lime Handling & Dust Suppression
An enclosed offloading, conveying and blending system replacing an open, double-handled lime process to control fugitive dust.
View →
RULA ZIM-01: Pneumatic Transfer System
Design, fabrication and equipment supply for a 10 t/h pneumatic transfer system moving fine baghouse dust through a 27 metre vertical lift to the main product silo.
View →
Savannah: Ash Handling System Upgrade
Integrated upgrade of an existing ash handling plant — redesigned pneumatic conveying, pressure vessels, surge hopper and screw conveyors — to improve reliability and reduce wear.
View →PPC Bulawayo: Mill Feed Bucket Elevators
Two 110 t/h bucket elevators replacing the existing mill feed airlift systems, delivered design-to-commissioning as a complete turnkey solution.
View →Sugözü Power Station: Ash Handling System
Multi-disciplinary bottom ash and fly ash handling system for a coal-fired power station, from boiler and ESP through to four storage silos.
View →Le Gol Power Plant: Coal, Bagasse & Clinker Handling
A comprehensive material handling solution covering coal, bagasse and clinker conveying, screening, crushing and storage for CDF Ingénierie.
View →
PPC Hercules: Fly Ash Pneumatic Offloading & Transport
Refurbished tanker offloading and new pneumatic conveying systems feeding the VRM and Sonex Mill under PPC's Ntšhafatso Project.
View →
Eskom Majuba: Tippler Refurbishment & Upgrade
Mechanical, hydraulic, electrical and control-system refurbishment of the coal tippler — including a full hydraulic drive conversion of the positioner.
View →Get a Project Quote
Throughput, timelines, and scope — tell us what you're moving.