Ash Handling Plant // Boiler House Units 1–6

Flue Gas Duct
Ash Handling

A specialized hydraulic conveyance infrastructure designed for the continuous removal of fly ash from boiler hoppers at high temperatures.

Medupi Power Station
Boiler House 1–6
PHIT-03

Project Stats

Project IDPHIT-03
ClientEskom
CategoryBoiler House 1–6
LocationMedupi Power Station

Project Overview

The Medupi Flue Gas project demonstrates RULA’s precision in handling high-temperature material flows and integrating complex hydraulic removal systems with downstream plant infrastructure.

// Specifications

Detailed Project Scope

Mechanical Components
  • Gate Valves: Motor Operated
  • Gravity Lines: High-Temp Ducting
  • Collecting Bin: 6 0ETG30 BB001
  • Bin Capacity: Approx 1.0 Ton
  • Operation Temp: 400°C Rated
Hydraulic Equipment
  • Pressure Pumps: 6 0ETN92/93 AP001
  • Pump Config: 1 Duty / 1 Standby
  • System Injector: 6 0ETN94 BN001
  • Conveying Type: Hydraulic Slurry
  • Duty Status: Continuous Removal
Pipeline Infrastructure
  • Feed Pipe: 6 0ETN91/92/93
  • Pressure Water: 6 0ETN94 BR010
  • Conveying Line: 6 0ETA90 BR010
  • Bypass Line: 6 0ETN95 BR010
  • Dewatering: 6 0ETN94 AA601

Project Outcomes

System Control Logic: LEVEL BASED SEQUENCING
SSC Interface: FULL SYSTEM SYNC
Safety Interlocks: WATER LEVEL MONITORING
Waste Routing: DEGRITTING SUMP LINK
Capabilities Delivered