System Upgrade

Replacement of the fly ash incline conveyor with a newly designed transfer system, integrating both the existing precipitator ash conveyors and the new bag filter ash conveyors into the existing ash silo.

Ngodwana, Mpumalanga
Sappi Ngodwana Mill
PNGO-02

Project Stats

Project IDPNGO-02
ClientSappi
CategorySappi Ngodwana Mill
LocationNgodwana, Mpumalanga

Project Overview

Replacement of the fly ash incline conveyor with a newly designed transfer system, integrating both the existing precipitator ash conveyors and the new bag filter ash conveyors into the existing ash silo.

// Project Scope

RULA Project Scope

RULA Project Scope

The project incorporated the design, engineering, procurement, fabrication, delivery, installation, commissioning and testing of the new ash transfer system. The scope included:

  • Design of a new fly ash transfer system with a capacity of 55 tonnes per hour, suitable for handling fly ash or lime during start-up conditions and material temperatures of up to 200°C
  • Review of the existing scraper conveyor and bucket elevator system to confirm its ability to meet the required capacity, including modifications where required
  • Design and integration of the new ash transfer system into the existing PF Boiler ash handling infrastructure
  • Tie-in of the new system to the existing ash silo
  • Integration with the existing precipitator feed conveyors, including the required isolation valves and rotary feeders
  • Structural and mechanical design, including detailing of equipment supports and specification of foundation/plinth loads
  • Specification of the associated electrical and control requirements
  • Procurement and fabrication of the new mechanical, structural and associated electrical equipment
  • Delivery of the complete system and equipment to site
  • Mechanical and structural installation of the new ash transfer system
  • Constructability reviews, construction planning and rigging studies
  • Provision of rigging equipment and resources required for installation
  • Corrosion protection of new and modified steelwork in accordance with Sappi specifications
  • Final commissioning and performance testing of the completed system

Project Outcomes

Design Capacity: 55 TPH
Max Temperature: 200 C
Feed Integration: DUAL SOURCE
Corrosion Protection: SAPPI SPEC
Capabilities Delivered

Considering A Similar Project?

RULA engineers and delivers bulk materials handling systems from initial design through commissioning.